NMR-facility: "Haus 36" - a history |
|
spring 1996: as we "found" it | |
fall 1996: with fresh make-up | |
at the end of 1996 the preparation
of house 36 was complete and the installation of the dmx750 was done end of 1996/beginning of 1997 |
|
summer 1998: a bit shorter but with the 750 inside | |
spring 2001: after the move of the 750 shorter again | |
spring 2002: gone | |
© Peter Schmieder, April 2005